Flooding tackled in Littleport

Reference:

034/11

Date:

22/03/2011

The first stage of the work to tackle surface water flooding in Littleport has been completed to reduce the risk of flooding for local residents.

East Cambridgeshire District Council bid for 141,000 from the Department for Environment, Food and Rural Affairs (Defra) last year to tackle flooding caused when the ground, and surface water drains reach capacity during periods of excessive rain..

read more

The full ECDC press release can be viewed here:Flooding tackled in Littleport

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *